IDB Maintenance Contracts

Experience in IDB maintenance has grown over the last 40 years and we currently carry out the annual maintenance for four drainage boards.

These works cover anything from basic de-weeding to timber management and civil engineering projects.

All equipment is fitted with height restrictors. One machine has a two piece boom in order that we can work under over head power lines.

To reduce chain saw usage, an excavator mounted tree cutter is used when timber is to be removed.

  • Flail mowing
  • De-weeding
  • Toe piling
  • Timber piling
  • Fencing
  • Re-instatement

IDB Structure Maintenance

  • Flap valves
  • Clough doors
  • Weed screens
  • Headwalls
  • Safety Works
    • Key Clamp Fencing
    • Ladders
    • Access Steps
    • Access

Coxon Brothers Copyright © 2015
Website designed and hosted by Howard Wilkinson